Steve's Basement Updates Main Basement Page | Planning | General | Framing | Wiring | Plumbing | Ductwork | Insulation | Drywall | Flooring | Built-Ins | Home Theater | Finishing Touches Well, we made it! We had a neighborhood party on December 11 and although we were working right up to the last minute, the "lower level" was completed in time.
What's New as of 12/11/04... 1) Cabinets, trim, and the ledge are all installed. See Finishing Touches and General. 2) The plumbing fixtures are installed. 3) The THEATER is installed. See Home Theater for an action video!
What's Next: Putty nail holes in trim, shelves in closets, knobs and pulls on cabinets, window treatments, etc... Then I have to finish my workshop.
Planning (11/03) Framing (12/03 - 3/04) Wiring (3/04 - 5/04) Plumbing (5/04 - 11/24/04) Ductwork (7/19/04) Insulation (7/25/04 - 8/04) Drywall (8/13/04 - 10/6/04) Flooring (10/11/04 - 11/16/04) Built-ins (not yet started) Home Theater (12/1/04-12/11/04)
Finishing Touches (10/7/04 - present) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|