Steve started the plumbing once the electrical was mostly complete. The plan
is to have a plumber come in to install the shower and other stuff.
|
|
|
|
|
|
|
|
|
These are Steve's first sweated copper joints. They seem to be holding. He put a water hammer arrestor on the lawn sprinkler line and T'd into the line to hook up an outdoor spigot. |
|
|
|
|
|
|
|
|
|
|
|
|
These are the shut-off valves for the bathroom. Steve had an incident in the master bath when he tested these valves. Ask him about it sometime! |
|
|
|
|
|
|
|
|
|
|
|
|
These are the water lines for the toilet and vanity as seen through the bedroom closet wall. |
|
|
|
|
|
|
|
|
|
|
|
|
Shower valve and water lines. |
|
|
|
|
|
|
|
|
|
|
|
|
Steve testing the water lines and valve for the shower. |
|
|
|
|
|
|
|
|
|
|
|
|
Steve soldering a cap on the end of a water line. |
|
|
|
|
|
|
|
|
|
|
|
|
|
The plumber had to cut a hole in the floor to hook up a drain for the shower. |
|
|
|
|
|
|
|
|
|
|
|
|
This shows the floor all patched up and ready for the shower. |
|
|
|
|
|
|
|
|
|
|